Site icon Happy Haute Home

Week 5 – “One Room Challenge” – Master Bathroom Renovation – Granite Countertops are Installed & Vanities are Painted


Welcome to Week 5 of our Master Bathroom One Room Challenge™.  Happy Haute Home is joining this Spring as a Guest Participant. This event is a widely anticipated biannual event every April and October. Each round, twenty design bloggers take the challenge and transform a space. Every Wednesday, the designers document their process while sharing their sources and professional advice over the six weekly posts. This challenge is hosted by Linda at Calling it Home.

If you missed my prior weeks posts on our master bathroom renovation, you can catch up here on design plans, progress, and budget.

Week 1/Week 2/Week 3/Week 4/

It has been a busy 5 weeks! The remodel of our master bathroom has been going really well with only a couple minor set backs.

Last week the bathtub was installed and looks beautiful.

This week, the vanity cabinets will get painted and the granite countertops will be installed.

The vanity cabinet painting is going well, although a bit slower than expected. The cabinets are requiring 4 coats of paint, but turning out better than I thought.

I will detail how I painted these cabinets in a future post.

Our granite countertops have arrived and are being installed!

The granite is so pretty with beautiful blues, a lot of black, green, gray and some white veining. It is called Volga Blue, and is 3cm thick. We chose double ogee edging. Here is a close up.

The installation went according to plan and the results are pictured below. The space looks so good with the white cabinets, the newly painted walls, and the charcoal flooring. I chose more contemporary rectangular sinks. We decided to make all the vanity hardware, mirrors, and vanity lighting all square/rectangular. We had 3 holes predrilled into the granite slabs to accommodate 8″ faucets.

This is a picture of my side of the bathroom.

This is my husband’s side, the painting hasn’t been finished yet.

The entire room was painted using Benjamin Moore’s “Gray Owl”. All the window trim, ceiling and floor boards are getting a fresh coat of white paint too.

Here’s a recap on where we stand 5 weeks into this major renovation. So far the following is done:

Completed –

Shower

Vanities

Water Closets (2)

Replaced all tiles on bathroom floor

Painted the entire bathroom including ceiling and trim

Hardware

BathTub

Still Needs to be Completed 

Shower

Vanities

Lighting

Bathtub

I’m feeling good about our timeline and where we stand. One week left!

Make sure to check back next week for the final reveal of our 6 week master bathroom renovation!

Exit mobile version